Four engagements, four different starting problems: a Rails monolith that had stopped shipping, a two-person engineering team that needed to double its product surface, a support queue outgrowing its headcount, and a payments core that could not pass a compliance re-audit. What they share is the shape of the work. Each was delivered by a dedicated StepTo squad of three to six engineers over a defined window of four to eighteen months, and each case study reports the team size, a phase-by-phase timeline, the tech stack, and Key Results with the baseline each figure was measured against.
The headline figures are before-and-after comparisons against each client's own prior numbers. The e-commerce rebuild ran the new storefront as a 50/50 A/B for 30 days before full cutover, then measured results 90 days after cutover. The RAG support system and the fintech rebuild were both measured over the quarter following full rollout, the fintech one alongside the recertification audit itself; its 18× reconciliation figure is the same month-end close, same team, timed before and after. The dedicated React team is compared quarter-over-quarter: 14 features shipped in the first quarter against 3 in the quarter before.
Which case study should you read first?
- If a legacy platform is slowing releases and hurting conversion, read the E-Commerce Platform Rebuild: StepTo replaced a 340,000-line Rails monolith with a headless Next.js storefront and three Node.js services, migrated with zero downtime.
- If you need engineering capacity faster than local hiring allows, read the Dedicated React Team: StepTo took a Series A startup from 3 features a quarter to 14.
- If support volume is outgrowing headcount, read AI Support Automation with RAG: StepTo built retrieval over docs, runbooks and resolved tickets, with every AI draft that is not auto-resolved reviewed by an agent before it sends.
- If you face a regulatory deadline on a system that was built quickly, read the Fintech Payments Compliance Rebuild: StepTo built an event-sourced ledger and migrated each payment rail in shadow mode with zero processing downtime.